The shower room of other people's house is so well installed, the reason lies in the installation st

It is a very common home improvement choice to install a shower room in the bathroom. This year my new house was renovated, and I also installed a shower room in the bathroom to follow the trend. But after the shower room was installed, I always felt something was wrong, as if it was different from other people's homes, but I couldn't tell what was wrong. I didn’t know until I saw the shower room installation of my neighbor’s house that my shower room installation was missing one step!Corner hydromassage shower cabin

Generally speaking, the installation steps of the shower room are mainly the following steps:

  

  The first step: installation of the bottom basin.

   For the installation of the bottom basin, the water-freeness of the bottom basin is a very important point. If moisture is retained, it will have a great impact on the installation. At the same time, when the bottom basin is connected to the pipeline, attention should be paid to its firmness to prevent water leakage. For hoses, the distance of the device can be adjusted as needed.

  

   Step two: Punch.

   Before drilling holes, check with water to ensure the accuracy of installation and ensure that the water can flow away normally. Then, the hole is punched, which is mainly used to fix the aluminum material against the wall. Then, inject the fixing rubber particles and other ingredients into it, and then fix the aluminum strip on the wall, and then fix the glass material to be used on the hole in the bottom basin.

  

   The third step: install the device rack.

   Drill a hole in the fixed glass, then install the fixing base, and then connect the top pipe. Then install the device rack. If there is no shelf in the shower room, the clothes to be changed when you go in for a bath will not be easy to put.

  

   Step 4: Install the sliding door.

  The installation of movable doors in the shower room can save space, and it will be more convenient to push and pull. After installing the sliding door, waterproof and fix the glass. Use glass glue to seal the places that need to be sealed.

  

   Step 5: Check the shower room.

   In order to ensure that the installed shower room has normal water resistance and unobstructed drainage, the shower room should be inspected after installation. If you find that there are some shortcomings in the water intake and drainage, you must repair it in time and tighten the screws.

  

   Step 6: Clean the shower room

   The glass surface and walls of the newly installed shower room should be wiped with a rag to ensure that the shower room is clean and tidy and convenient for future use.

Bath Shower Cabin Manufacturers

Shower Screens Manufacturers

0コメント

  • 1000 / 1000